Foreach TechnologyForeach Technology
Home
Products
Applications
About Us
Contact & Partnership
简体中文EnglishEspañolFrançais한국어Русский
Home
Products
Pump SeriesValve SeriesTubing SeriesFitting SeriesProbe SeriesSmart Control SeriesTubing Assemblies
Applications
All applicationsIVD DiagnosticsLife SciencesLaboratory AutomationAnalytical InstrumentsEnvironmental MonitoringSynthetic Biology
Resources
DatasheetsFluid Resistance CalculatorFitting ReplacementInstallation GuidesMaterial CompatibilityTechnical ArticlesCompany News
About Us
About ForeachR&D and ManufacturingQuality System and QualificationsMilestonesForeach Culture
Contact & Partnership
Contact UsBecome a Distributor
  • Pump Series
  • Valve Series
  • Probe Series
  • Fitting Series
  • Tubing Series
  • Control Series
  • Tubing Assemblies
  • All applications
  • IVD
  • Life Science
  • Lab Automation
  • Analytical Instruments
  • Environmental Monitoring
  • Synthetic Biology
  • Datasheets
  • Fluid Resistance Calculator
  • Fitting Replacement
  • Installation Guides
  • Material Compatibility
  • Technical Articles
  • Company News
  • About Foreach
  • R&D & Manufacturing
  • Quality & Compliance
  • History
  • Foreach Culture
  • Inquiry Form
  • Contact Information

Shenzhen Foreach Technology Co., Ltd.

Address: 13th Floor, 2nd Building, Yufengda Industrial Park, 1008th Guang Qiao Boulevard, Guangming District, Shenzhen 518132 CHINAView Map

Email: [email protected]

Tel: +86 755 8655 3831

LinkedInYouTubeFacebookInstagramX

© 2026 Shenzhen Foreach Technology Co., Ltd. All rights reserved.

Privacy Policy·

Home/Applications/Analytical instruments/Water analysis units
< Back

Water analysis units: filter protection

Application guide

This guide covers filtration protection in water-analysis units: component roles, action sequence, operating conditions and restart requirements. Identify the architecture before comparing configurations.

Application guides

Water-Quality Analysis Unit Guide

Water-analysis unit fluidics overview
Piston Pumps for Water-Quality Analysis Units
Sample meteringMetered reagent addition and reaction timing
Syringe pumps in water analysis units
Diaphragm Pumps for Water-Quality Analysis Units
Multiport rotary valves in water-analysis units
Bubble and pressure detection in water analysis units
Tubing connections and protection in water analysis units
Protective filtration

ON THIS PAGE

Where protective filtration fits in the instrumentProduct responsibilities in this operationOrganize the sequence by actual architectureDefine operating conditions for this taskCompare product configurations by the roles on this pageValidate operation results at the receiverLocate abnormalities and restore the next operationReferencesRelated guides

01Where protective filtration fits in the instrument

Define whether the target is dissolved, particle-associated or another method-specific fraction before choosing the filtration location. Assess adsorption, analyte loss, filtration resistance and recovery after replacement.

Filtration can reduce particle entry into components while also changing the measured sample. Assess adsorption, retention, pressure drop and recovery after replacement. Method acceptability takes priority over mechanical protection.

02Product responsibilities in this operation

Tubing, fittings and the protection components described here form the actual path. Validate materials, passage dimensions, connection volume and maintenance state with this operation.

For this water-quality analysis task, define the analytical target, filter material and pore size, filtration location, added volume, actual pressure drop and permitted maintenance.

03Organize the sequence by actual architecture

  1. Use the analytical method to define the measured components and permitted filter location first. Distinguish dissolved, particle-associated or other specified components, then explain the protective purpose.
  2. Select candidate filter materials, pore sizes and structures for validation with actual samples. Check added volume, initial pressure drop and the metering path after installing the filter.
  3. Compare targets, blanks or recovery before and after filtration, and track pressure drop and delivery during use. Unobstructed flow alone does not establish sample validity.
  4. After replacement or maintenance, recheck assembly, priming and first-sample results. Validate backflow control separately through the check valves or isolation components actually installed.

04Define operating conditions for this task

Conditions, results and abnormality records for this operation
To defineDetails
Actual operating conditionsAnalytical target, filter material/pore size, filtration location, added volume, actual pressure drop and permitted maintenance
Acceptance targetCompare analytes, recovery and blanks before and after filtration. Check pressure drop and actual flow after loading accumulates, and the first sample after replacement.
Fault localizationBlockage, adsorption, leakage or added filter-assembly volume can change the sample and its arrival time.

05Compare product configurations by the roles on this page

Configuration options for the product roles on this page
ProductConfiguration optionConditions to verify
PE-Series FiltersParticle retention permitted by the methodCards show representative configurations. Select actual pore size and filter material for the target, pressure drop and recovery requirements.
Tubing materials and dimensionsConnection paths and shared volumeBore, length, load and actual formulation jointly determine materials and dimensions
Rigid-tubing fittingsTube-end positioning and sealed connectionsCheck tube outer diameter, threads, seal structure and port-bottom geometry
  • PE-Series Filters
  • Tubing materials and dimensions
  • Rigid-tubing fittings

06Validate operation results at the receiver

Compare analytes, recovery and blanks before and after filtration. Check pressure drop and actual flow after loading accumulates, and the first sample after replacement.

Assess dose, reaction, blanks and recovery according to the method, and verify what is measured after filtration.

07Locate abnormalities and restore the next operation

Clogging, adsorption, leakage or added filter-assembly volume can change the sample and arrival time.

Confirm the filtration path and sealing, then recheck actual flow, sample renewal and method results before resuming.

Validate field representativeness and internal metering separately. Filtration intended to protect components must still meet method requirements.

References

View references (3)
  1. [1]FOREACH PE series filters: configurations and specifications
  2. [2]FOREACH tubing materials and dimensions: configurations and specifications
  3. [3]FOREACH rigid-tubing fittings: configurations and specifications

Related guides

  • Back to the water analysis unit fluidics overview
  • Tubing connections and protection in water analysis units

Related Products

PE-Series Filters; representative configuration. Select capacity, materials and interfaces for the application.

PE-Series Filters

Tubing materials and dimensions; representative configuration. Select capacity, materials and interfaces for the application.

Tubing materials and dimensions

Rigid-tubing fittings; representative configuration. Select capacity, materials and interfaces for the application.

Rigid-tubing fittings

Related Technical Articles

What is flow resistance calculation for? Using the Foreach calculator in fluid-path design and selection

The free flow rate of the pump meets the requirements. After installing the pipelines, valves and joints, the liquid supply at the end is insufficient. Flow resistance calculations can break the problem down into comparable data: what pressure differential is required at the target flow rate, where does the pressure loss mainly occur, and what happens if the pipe diameter, pipe length, component Cv or medium viscosity is changed. This article combines the actual function of the Foreach flow resistance calculator with a recalculable fluid circuit case to explain how to use the calculation results for design, selection, troubleshooting and prototype verification.

2026-09-11View Details

Why Does Actual Flow Change So Much When the Tubing Size Changes on the Same Miniature Diaphragm Pump?

Even when the pump is unchanged, installed flow can change because of tubing inner diameter, length, bends, and the minimum bore of fittings. When flow falls after a tubing change, the effective response is neither to blame the pump first nor to enlarge every tube indiscriminately. Measure inlet pressure, outlet pressure, and accumulated flow together to determine where the added restriction actually occurs.

2026-08-24View Details

Piston Pump Accuracy, Repeatability and Resolution Explained

Learn why theoretical volume per step is not the minimum reliable dose, and how accuracy, repeatability, valves, bubbles and working stroke affect dispensing results.

2026-09-06View Details

Discuss fluidic configurations for water analysis units

Provide a fluidic diagram, actual liquids and pressures in each operating state. Cards show representative configurations; choose actual pore size and filter material for the analyte, pressure drop and recovery. Select tubing material and dimensions using bore, length, load and formulation. Check OD, threads, sealing structure and port-bottom geometry. Compare configurations against this guide's validation objectives.

Contact an engineer