Foreach TechnologyForeach Technology
Home
Products
Applications
About Us
Contact & Partnership
简体中文EnglishEspañolFrançais한국어Русский
Home
Products
Pump SeriesValve SeriesTubing SeriesFitting SeriesProbe SeriesSmart Control SeriesTubing Assemblies
Applications
All applicationsIVD DiagnosticsLife SciencesLaboratory AutomationAnalytical InstrumentsEnvironmental MonitoringSynthetic BiologyIndustrial Inkjet Printing
Resources
Frequently Asked QuestionsDatasheetsFluid Resistance CalculatorFitting ReplacementInstallation GuidesMaterial CompatibilityTechnical ArticlesCompany News
About Us
About ForeachR&D and ManufacturingQuality System and QualificationsMilestonesForeach Culture
Contact & Partnership
Contact UsBecome a Distributor
  • Pump Series
  • Valve Series
  • Probe Series
  • Fitting Series
  • Tubing Series
  • Control Series
  • Tubing Assemblies
  • All applications
  • IVD
  • Life Science
  • Lab Automation
  • Analytical Instruments
  • Environmental Monitoring
  • Synthetic Biology
  • Industrial Inkjet Printing
  • Frequently Asked Questions
  • Datasheets
  • Fluid Resistance Calculator
  • Fitting Replacement
  • Installation Guides
  • Material Compatibility
  • Technical Articles
  • Company News
  • About Foreach
  • R&D & Manufacturing
  • Quality & Compliance
  • History
  • Foreach Culture
  • Inquiry Form
  • Contact Information

Shenzhen Foreach Technology Co., Ltd.

Address: 13th Floor, 2nd Building, Yufengda Industrial Park, 1008th Guang Qiao Boulevard, Guangming District, Shenzhen 518132 CHINAView Map

Email: [email protected]

Tel: +86 755 8655 3831

LinkedInYouTubeFacebookInstagramX

© 2026 Shenzhen Foreach Technology Co., Ltd. All rights reserved.

Privacy Policy··Photo credits

Home/Applications/Industrial Inkjet Printing/Industrial Inkjet Printer Fluidics Guide/Ink Filtration, Check Valves and Flow Control/Cleaning Fluid Switching and Branch Isolation
< Back

Selecting Valves for Cleaning-Fluid Switching and Branch Isolation

Application guide

The maintenance station must deliver cleaning fluid to the designated point and route waste to the bottle at the proper stage. Before selecting a valve, establish which two ports communicate at each step and which branch could still pass liquid after an unexpected power loss.

Application guide

Industrial Inkjet Printer Fluidics Guide

Industrial Inkjet Printer Fluidics Guide
Diaphragm pump selection
Ink Supply & RefillInk Recirculation & ReturnPrinthead Cleaning & Waste Ink
Tubing Assemblies and Fittings for Industrial Inkjet Printers
Fixed Ink Lines and Tubing AssembliesInk Tank Changes and Maintenance Quick Disconnects
Ink Filtration, Check Valves and Flow Control
Ink Filtration for Industrial Inkjet PrintersCleaning Fluid Switching and Branch Isolation

On this page

Valve states and portsShared line and residual fluidPower loss and recoveryReferences

01Map the maintenance valve states before choosing two-way or three-way operation

On a capped maintenance station, filling the cap, soaking the nozzle face and draining the line below the cap can be separate steps. Mimaki's UJF MkII manual specifies separate nozzle-cleaning and drain-channel cleaning operations. In the sequence for your machine, list fluid source and waste destination separately and identify which sections are valve-controlled and which rely on pump suction.[1]

Selecting a FOREACH SV10 configuration by port function[3]
Required flow pathCandidate configurationState to mark on the installation drawing
Shut off the cleaning-fluid supply on loss of powerSV10-P-2NC two-way normally closed manifold valveTrace the manifold inlet to the cap. De-energize the valve at the largest operating difference in tank levels and observe whether liquid still enters downstream.
A designated branch must stay open on loss of powerSV10-P-2NO two-way normally open manifold valveMark the ports connected without power and use the difference in liquid levels to determine where fluid can go.
Connect one common port alternately to two branchesSV10-B16-3 three-way barbed valveVerify the common port, permitted flow direction and differential. If shutdown requires both branches to close, provide separate isolation.
  • SV10-B16-3 three-way barbed solenoid valve

    SV10-B16-3 three-way barbed solenoid valve

    For hose connections to a maintenance station, mark the common port and both branch ports from the drawing. Verify the delivery point with power on and off.

    View product details

Use the SV10 valve and connection guide to verify manifold or tube connections, port direction and diaphragm configuration. Record the ink, maintenance fluid, temperature and contact time when the fluids mix. Pressure at the valve depends on whether it is upstream or downstream of the pump. Time fluid delivery with the entire circuit assembled.[3][2]

02How much fluid must be displaced after switching a shared line?

When several bottles feed one maintenance port in sequence, evaluate an MRV3 multiport rotary valve. List the valve cavities, fittings and fixed tubing sections between the common port and the receiving point. Estimate hold-up using the actual bore and length. For example, a straight tube 0.5 m long with 2 mm ID holds about 1.57 mL before fittings and valve cavities are counted. Use this to plan the first sample, then determine the required displacement from measured outlet carryover.[4]

At an approved maintenance outlet or on a test bench, collect successive samples after switching and record each volume. For residual colored ink, compare calibrated color or absorbance readings. For two clear fluids, use a measure that distinguishes their formulations. If residual carryover remains excessive within the permitted fluid budget, shorten the common section or give incompatible fluids separate branches.

03How to confirm routing from maintenance through return to print

  1. During supply, check arrival time and delivered volume at the maintenance station while observing the unselected branch. If the valve operates but no fluid reaches the cap, verify the source, common port and pump direction against the port drawing.
  2. During drainage, measure volume collected and time to completion at the waste bottle. If fluid reaches the cap but does not drain fully, follow Printhead cleaning and waste ink removal to check the tubing below the cap, waste pump and container.
  3. On the test bench, reproduce planned shutdown and power loss at the actual difference in tank levels. Record where each port leads and any crossflow. Restore ink supply using the machine reset sequence, then verify that the first nozzle check and first production prints meet the project's acceptance criteria.

References

View references (4)
  1. [1]Mimaki UJF-3042/6042 MkII series operation manual, chapter 4: cleaning the nozzles and drain path
  2. [2]Bürkert technical report on solenoid valves for industrial inkjet
  3. [3]FOREACH SV10 two-way and three-way miniature solenoid valves
  4. [4]FOREACH multiport rotary valve selection guide

Related Products

SV10 three-way miniature solenoid valves with manifold and barbed connections

SV10 miniature solenoid valve

Discuss your ink circuit

Provide the fluid circuit diagram, allowable head pressure, actual ink and cleaning fluid, operating flow, pressure differential and pump shutdown conditions. For parallel branches, identify valve positions, their de-energized state and the destination of the waste.

Discuss your application