Map the maintenance valve states before choosing two-way or three-way operation
On a capped maintenance station, filling the cap, soaking the nozzle face and draining the line below the cap can be separate steps. Mimaki's UJF MkII manual specifies separate nozzle-cleaning and drain-channel cleaning operations. In the sequence for your machine, list fluid source and waste destination separately and identify which sections are valve-controlled and which rely on pump suction.[1]
| Required flow path | Candidate configuration | State to mark on the installation drawing |
|---|---|---|
| Shut off the cleaning-fluid supply on loss of power | SV10-P-2NC two-way normally closed manifold valve | Trace the manifold inlet to the cap. De-energize the valve at the largest operating difference in tank levels and observe whether liquid still enters downstream. |
| A designated branch must stay open on loss of power | SV10-P-2NO two-way normally open manifold valve | Mark the ports connected without power and use the difference in liquid levels to determine where fluid can go. |
| Connect one common port alternately to two branches | SV10-B16-3 three-way barbed valve | Verify the common port, permitted flow direction and differential. If shutdown requires both branches to close, provide separate isolation. |
Use the SV10 valve and connection guide to verify manifold or tube connections, port direction and diaphragm configuration. Record the ink, maintenance fluid, temperature and contact time when the fluids mix. Pressure at the valve depends on whether it is upstream or downstream of the pump. Time fluid delivery with the entire circuit assembled.[3][2]
How much fluid must be displaced after switching a shared line?
When several bottles feed one maintenance port in sequence, evaluate an MRV3 multiport rotary valve. List the valve cavities, fittings and fixed tubing sections between the common port and the receiving point. Estimate hold-up using the actual bore and length. For example, a straight tube 0.5 m long with 2 mm ID holds about 1.57 mL before fittings and valve cavities are counted. Use this to plan the first sample, then determine the required displacement from measured outlet carryover.[4]
At an approved maintenance outlet or on a test bench, collect successive samples after switching and record each volume. For residual colored ink, compare calibrated color or absorbance readings. For two clear fluids, use a measure that distinguishes their formulations. If residual carryover remains excessive within the permitted fluid budget, shorten the common section or give incompatible fluids separate branches.
How to confirm routing from maintenance through return to print
- During supply, check arrival time and delivered volume at the maintenance station while observing the unselected branch. If the valve operates but no fluid reaches the cap, verify the source, common port and pump direction against the port drawing.
- During drainage, measure volume collected and time to completion at the waste bottle. If fluid reaches the cap but does not drain fully, follow Printhead cleaning and waste ink removal to check the tubing below the cap, waste pump and container.
- On the test bench, reproduce planned shutdown and power loss at the actual difference in tank levels. Record where each port leads and any crossflow. Restore ink supply using the machine reset sequence, then verify that the first nozzle check and first production prints meet the project's acceptance criteria.