Foreach TechnologyForeach Technology
Home
Products
Applications
About Us
Contact & Partnership
简体中文EnglishEspañolFrançais한국어Русский
Home
Products
Pump SeriesValve SeriesTubing SeriesFitting SeriesProbe SeriesSmart Control SeriesTubing Assemblies
Applications
All applicationsIVD DiagnosticsLife SciencesLaboratory AutomationAnalytical InstrumentsEnvironmental MonitoringSynthetic Biology
Resources
DatasheetsFluid Resistance CalculatorFitting ReplacementInstallation GuidesMaterial CompatibilityTechnical ArticlesCompany News
About Us
About ForeachR&D and ManufacturingQuality System and QualificationsMilestonesForeach Culture
Contact & Partnership
Contact UsBecome a Distributor
  • Pump Series
  • Valve Series
  • Probe Series
  • Fitting Series
  • Tubing Series
  • Control Series
  • Tubing Assemblies
  • All applications
  • IVD
  • Life Science
  • Lab Automation
  • Analytical Instruments
  • Environmental Monitoring
  • Synthetic Biology
  • Datasheets
  • Fluid Resistance Calculator
  • Fitting Replacement
  • Installation Guides
  • Material Compatibility
  • Technical Articles
  • Company News
  • About Foreach
  • R&D & Manufacturing
  • Quality & Compliance
  • History
  • Foreach Culture
  • Inquiry Form
  • Contact Information

Shenzhen Foreach Technology Co., Ltd.

Address: 13th Floor, 2nd Building, Yufengda Industrial Park, 1008th Guang Qiao Boulevard, Guangming District, Shenzhen 518132 CHINAView Map

Email: [email protected]

Tel: +86 755 8655 3831

LinkedInYouTubeFacebookInstagramX

© 2026 Shenzhen Foreach Technology Co., Ltd. All rights reserved.

Privacy Policy·

Home/Applications/Analytical instruments/Analytical system integration
< Back

Analytical system integration: ports and interlocks

Application guide

Ports and interlocks support specific liquid operations in analytical system integration. This page explains component roles, action sequence, actual operating conditions and recovery requirements. Establish the architecture before comparing configurations.

Application guides

Analytical system integration application guide

Analytical system integration fluidics overview
Piston Pumps for Analytical System Integration
Syringe pumps in analytical system integration
Valveless metering pumps in analytical system integration
Diaphragm pumps in analytical system integration
Fluidic Valves for Analytical System Integration
Ports and interlocks
Bubble and pressure sensing in analytical system integration
Tubing and Fittings for Analytical System Integration

ON THIS PAGE

Where ports and interlocks fit in the instrumentProduct responsibilities in this operationOrganize the sequence by actual architectureDefine operating conditions for this taskCompare product configurations by the roles on this pageValidate operation results at the receiverLocate abnormalities and restore the next operationReferencesRelated guides

01Where ports and interlocks fit in the instrument

Map port states and interlocks for sample, standard, reagent, wash and waste paths. Include shared sections, unintended connections and transport delay. Define whether detection stops during faults and how affected samples are flagged.

Include measurement, washing, bypass and fault states in the drawings. Shared volume and transport delay determine when a signal can be identified as a valid sample measurement.

02Product responsibilities in this operation

Valves control the current source or destination; the associated drive performs metering or transfer. Port connections, actual positioning and shared-segment renewal must match the operation.

For this analytical system integration task, confirm task state, sample/vessel identity, concurrent resources, interlocks and recovery.

03Organize the sequence by actual architecture

  1. Create a port-state table for samples, standards, reagents, wash liquids and waste, covering measurement, displacement, washing, maintenance bypass and abnormal states.
  2. Match valve positions to permitted pump states in each branch. Verify the current source, receiver, shared segments and paths requiring isolation.
  3. After switching, renew the path according to actual volume and flow conditions. Confirm target composition and signal recovery at the receiver before allowing that measurement window to produce valid results.
  4. Check unintended connections, leakage when closed and liquid destinations after interruptions. Preserve sample identity and completed-stage records. Before rejoining the analytical program, confirm the actual path and blanks.

04Define operating conditions for this task

Conditions, results and abnormality records for this operation
To defineDetails
Actual operating conditionsTask state, sample or vessel identity, concurrent resources, interlocks and restart
Acceptance targetTest concurrent operation, limiting states and complete fault recovery; verify that identities, cumulative quantities and records match actual actions
Fault localizationResource conflicts, communication loss or mismatched identities can cause delivery to the wrong destination or repeated dosing.

05Compare product configurations by the roles on this page

Configuration options for the product roles on this page
ProductConfiguration optionConditions to verify
MRV3 multiport rotary valveMultiple-source selectionCompare 10-, 16- and 24-port options and port diagrams; verify high-pressure suitability separately
SV10 solenoid valveOn/off control or branch selectionCheck normal state, differential pressure, flow direction and duty cycle; high-pressure tasks require a separately suitable configuration
  • MRV3 multiport rotary valve
  • SV10 solenoid valve

06Validate operation results at the receiver

Cover concurrency, boundary states and complete recovery after faults. Check that identity, cumulative volume and records match actual operations.

Check delivery, response, blanks and fault recovery through the complete method cycle.

07Locate abnormalities and restore the next operation

Resource conflicts, communication interruptions or identity mismatches can cause misdelivery or duplicate dispensing.

Stop the affected branches and recover using execution records.

Configure metering, continuous supply, liquid washing and air-containing waste removal separately. See Laboratory Automation for platform scheduling.

References

View references (2)
  1. [1]FOREACH MRV3 multiport rotary valve: configurations and specifications
  2. [2]FOREACH SV10 solenoid valve: configurations and specifications

Related guides

  • Back to analytical system integration fluidics
  • Fluidic Valves for Analytical System Integration

Related Products

MRV3 multiport rotary valve; representative configuration. Select capacity, materials and interfaces for the application.

MRV3 multiport rotary valve

SV10 solenoid valve; representative configuration. Select capacity, materials and interfaces for the application.

SV10 solenoid valve

Related Technical Articles

Rotary Valve Selection Guide: From Fluid Paths to System Validation

Map the connections required at each step before comparing specifications. Use the actual liquids, tubing and switching sequence to validate suitability for your instrument.

2026-09-30View Details

How Does a 6-Port HPLC Injection Valve Work? Load, Inject and Vent

Follow sample loading into an external loop and transfer to the column by the mobile phase, distinguishing the HP valve's main positions and vent path from the factors that determine injection volume.

2026-09-29View Details

Piston Pump Accuracy, Repeatability and Resolution Explained

Learn why theoretical volume per step is not the minimum reliable dose, and how accuracy, repeatability, valves, bubbles and working stroke affect dispensing results.

2026-09-06View Details

Discuss fluidic configurations for analytical system integration

Provide a fluidic diagram, actual liquids and pressures in each operating state. Compare 10-, 16- and 24-port options using port diagrams, and verify high-pressure suitability separately. Check normal state, differential pressure, flow direction and energization cycle. Select a separately suitable configuration for high-pressure tasks. Assess configurations against this guide's validation objectives.

Contact an engineer