Foreach TechnologyForeach Technology
Home
Products
Applications
About Us
Contact & Partnership
简体中文EnglishEspañolFrançais한국어Русский
Home
Products
Pump SeriesValve SeriesTubing SeriesFitting SeriesProbe SeriesSmart Control SeriesTubing Assemblies
Applications
All applicationsIVD DiagnosticsLife SciencesLaboratory AutomationAnalytical InstrumentsEnvironmental MonitoringSynthetic Biology
Resources
DatasheetsFluid Resistance CalculatorFitting ReplacementInstallation GuidesMaterial CompatibilityTechnical ArticlesCompany News
About Us
About ForeachR&D and ManufacturingQuality System and QualificationsMilestonesForeach Culture
Contact & Partnership
Contact UsBecome a Distributor
  • Pump Series
  • Valve Series
  • Probe Series
  • Fitting Series
  • Tubing Series
  • Control Series
  • Tubing Assemblies
  • All applications
  • IVD
  • Life Science
  • Lab Automation
  • Analytical Instruments
  • Environmental Monitoring
  • Synthetic Biology
  • Datasheets
  • Fluid Resistance Calculator
  • Fitting Replacement
  • Installation Guides
  • Material Compatibility
  • Technical Articles
  • Company News
  • About Foreach
  • R&D & Manufacturing
  • Quality & Compliance
  • History
  • Foreach Culture
  • Inquiry Form
  • Contact Information

Shenzhen Foreach Technology Co., Ltd.

Address: 13th Floor, 2nd Building, Yufengda Industrial Park, 1008th Guang Qiao Boulevard, Guangming District, Shenzhen 518132 CHINAView Map

Email: [email protected]

Tel: +86 755 8655 3831

LinkedInYouTubeFacebookInstagramX

© 2026 Shenzhen Foreach Technology Co., Ltd. All rights reserved.

Privacy Policy·

Home/Applications/Environmental monitoring/Environmental sample preparation
< Back

Tubing connections and protection in environmental sample preparation

Application guide

Explore connection and protection placement, coordination and configuration for method-specified filtration and complete transfer paths that preserve target constituents, with links to environmental sample preparation tasks.

Application guides

Environmental sample preparation application guide

Environmental sample preparation fluidics overview
Syringe Pumps for Environmental Sample Preparation
Dilution
Air-displacement pipetting pumps in environmental sample preparation
Tip-based environmental sample aliquoting and transfer
Multiport Rotary Valves for Environmental Sample Preparation
Tubing connections and protection in environmental sample preparation
FiltrationWaste and washing

ON THIS PAGE

What do these products do in this instrument?Design tubing and fittings as a complete wetted pathCheck analyte retention while protecting componentsTranslate actual branch conditions into configuration requirementsCompare product configurations by the roles on this pageExplore specific operating and validation tasksConfirm product roles in actual operationDoes a fitting that tightens prove the tubing assembly is suitable?ReferencesRelated guides

01What do these products do in this instrument?

Filters: analytical-method-specified filtration

Treat samples at the method-specified location. Decide whether to filter and select filter material according to the measured components. Assess analytes, blanks, pressure drop and the first sample after replacement separately.

Filters provide method-permitted particle retention or component protection. Target components, pore size and filter material guide selection. Assess pressure drop, adsorption and recovery after replacement in the actual path.

Tubing and fittings: complete paths that preserve target constituents

Connect sample, pump and receiver in fixed fluidics, checking wetted materials against the actual matrix. Include every connection in target-recovery, carryover and washing-recovery assessment.

Tubing and fittings together form sealed connections and the actual transfer path. Check formulation, inner/outer diameters, length, tube-end positioning and port geometry, including added volume in residue and arrival delay.

02Design tubing and fittings as a complete wetted path

Tubing, fittings and ports jointly determine sealing, transfer volume and medium-contact coverage. Materials and dimensions must suit formulation, operating conditions and installation. Include tubing length and interface volume in priming, shared residue and arrival delay. After connection changes, recheck delivery and cleaning through the actual path.

03Check analyte retention while protecting components

Filters provide method-permitted particle retention or component protection. With actual samples and filter materials, check adsorption, blanks, pressure drop and flow changes as loading accumulates, while measuring analyte recovery. The specific method must validate whether the filtrate remains suitable for analysis.

04Translate actual branch conditions into configuration requirements

Connection and protection configuration for environmental sample preparation
ConditionTo confirm
Materials and assemblyProvide formulation, tubing inner/outer diameters, length, fitting structure and port fit.
Volume and loadCalculate shared and replacement-component added volumes; measure actual flow and response.
Filtration and method requirementsConfirm filter material and pore size. Compare analyte recovery, blanks and pressure drop before and after fouling, and record recovery after replacement.
Operations supported in this instrument
OperationSpecific operating conditions
FiltrationAnalytical target, filter material/pore size, filtration location, added volume, actual pressure drop and permitted maintenance
Waste and washingSample and wash-waste destinations, shared paths, peak drainage and maintenance requirements

05Compare product configurations by the roles on this page

Configuration options for the product roles on this page
ProductConfiguration optionConditions to verify
PE-Series FiltersParticle retention permitted by the methodCards show representative configurations. Select actual pore size and filter material for the target, pressure drop and recovery requirements.
Tubing materials and dimensionsConnection paths and shared volumeBore, length, load and actual formulation jointly determine materials and dimensions
Rigid-tubing fittingsTube-end positioning and sealed connectionsCheck tube outer diameter, threads, seal structure and port-bottom geometry
  • PE-Series Filters
  • Tubing materials and dimensions
  • Rigid-tubing fittings

06Explore specific operating and validation tasks

Filtration

Pore size, medium and position depend on the method. Check targets, adsorption and pressure drop before and after filtration, and the first sample after replacement.

  • Filtration

Waste and washing

Organize destinations according to media and cleaning agents. After washing, check blanks or the next sample rather than relying on tubing appearance.

  • Waste and washing

07Confirm product roles in actual operation

Operating-point validation and fault localization
OperationMeasurements and observationsPriority checks
FiltrationCompare analytes, recovery and blanks before and after filtration. Check pressure drop and actual flow after loading accumulates, and the first sample after replacement.Blockage, adsorption, leakage or added filter-assembly volume can change the sample and its arrival time.
Waste and washingMeasure actual drainage and vessel protection, then use a blank or the next sample to verify shared-path washing recoveryIncorrect waste routing, accumulated liquid or cleaning residue can contaminate the next sample.

Evaluate blanks, recovery, aliquot representativeness and restart according to the method.

08Does a fitting that tightens prove the tubing assembly is suitable?

Also confirm port geometry, tube-end positioning and seal fit. Check leakage, hold-up and performance after repeated maintenance under actual conditions; thread engagement alone is insufficient.

Dilution metering can share general engineering methods, but field preservation, particles and analyte loss require separate checks.

References

View references (3)
  1. [1]FOREACH PE series filters: configurations and specifications
  2. [2]FOREACH tubing materials and dimensions: configurations and specifications
  3. [3]FOREACH rigid-tubing fittings: configurations and specifications

Related guides

  • Return to the environmental sample preparation overview
  • Filtration
  • Waste and washing

Related Products

PE-Series Filters; representative configuration. Select capacity, materials and interfaces for the application.

PE-Series Filters

Tubing materials and dimensions; representative configuration. Select capacity, materials and interfaces for the application.

Tubing materials and dimensions

Rigid-tubing fittings; representative configuration. Select capacity, materials and interfaces for the application.

Rigid-tubing fittings

Related Technical Articles

What is flow resistance calculation for? Using the Foreach calculator in fluid-path design and selection

The free flow rate of the pump meets the requirements. After installing the pipelines, valves and joints, the liquid supply at the end is insufficient. Flow resistance calculations can break the problem down into comparable data: what pressure differential is required at the target flow rate, where does the pressure loss mainly occur, and what happens if the pipe diameter, pipe length, component Cv or medium viscosity is changed. This article combines the actual function of the Foreach flow resistance calculator with a recalculable fluid circuit case to explain how to use the calculation results for design, selection, troubleshooting and prototype verification.

2026-09-11View Details

Why Does Actual Flow Change So Much When the Tubing Size Changes on the Same Miniature Diaphragm Pump?

Even when the pump is unchanged, installed flow can change because of tubing inner diameter, length, bends, and the minimum bore of fittings. When flow falls after a tubing change, the effective response is neither to blame the pump first nor to enlarge every tube indiscriminately. Measure inlet pressure, outlet pressure, and accumulated flow together to determine where the added restriction actually occurs.

2026-08-24View Details

What Is a Programmable Syringe Pump? Operation, Fluid Routing and Automation

A programmable syringe pump uses a motor to control syringe plunger displacement and speed, executing aspiration, dispensing, pauses and repeated actions through commands. With a routing valve, it can connect reagent reservoirs, reaction vessels and wash paths into an automated dispensing process. Instrument development therefore needs to define volume, fluid connections and timing together.

2026-09-28View Details

Discuss an environmental sample preparation configuration

Provide a fluidic diagram, actual liquids and pressures in each operating state. Cards show representative configurations; choose actual pore size and filter material for the analyte, pressure drop and recovery. Select tubing material and dimensions using bore, length, load and formulation. Check OD, threads, sealing structure and port-bottom geometry. Compare configurations against this guide's validation objectives.

Contact an engineer