Foreach TechnologyForeach Technology
Home
Products
Applications
About Us
Contact & Partnership
简体中文EnglishEspañolFrançais한국어Русский
Home
Products
Pump SeriesValve SeriesTubing SeriesFitting SeriesProbe SeriesSmart Control SeriesTubing Assemblies
Applications
All applicationsIVD DiagnosticsLife SciencesLaboratory AutomationAnalytical InstrumentsEnvironmental MonitoringSynthetic Biology
Resources
DatasheetsFluid Resistance CalculatorFitting ReplacementInstallation GuidesMaterial CompatibilityTechnical ArticlesCompany News
About Us
About ForeachR&D and ManufacturingQuality System and QualificationsMilestonesForeach Culture
Contact & Partnership
Contact UsBecome a Distributor
  • Pump Series
  • Valve Series
  • Probe Series
  • Fitting Series
  • Tubing Series
  • Control Series
  • Tubing Assemblies
  • All applications
  • IVD
  • Life Science
  • Lab Automation
  • Analytical Instruments
  • Environmental Monitoring
  • Synthetic Biology
  • Datasheets
  • Fluid Resistance Calculator
  • Fitting Replacement
  • Installation Guides
  • Material Compatibility
  • Technical Articles
  • Company News
  • About Foreach
  • R&D & Manufacturing
  • Quality & Compliance
  • History
  • Foreach Culture
  • Inquiry Form
  • Contact Information

Shenzhen Foreach Technology Co., Ltd.

Address: 13th Floor, 2nd Building, Yufengda Industrial Park, 1008th Guang Qiao Boulevard, Guangming District, Shenzhen 518132 CHINAView Map

Email: [email protected]

Tel: +86 755 8655 3831

LinkedInYouTubeFacebookInstagramX

© 2026 Shenzhen Foreach Technology Co., Ltd. All rights reserved.

Privacy Policy·

Home/Applications/Laboratory automation/Workstation fluidic integration
< Back

Platform Fluidic Integration: Flow-Path Management

Application guide

Flow-path management is a platform fluidic integration task. This page explains component roles, operating sequence, actual operating conditions and restart requirements. Identify the architecture before comparing configurations.

Application guides

Workstation fluidic integration application guide

Platform fluidics integration overview
Syringe pumps in workstation fluidic integration
Air-Displacement Pipetting Pumps for Platform Fluidic Integration
Diaphragm Pumps for Platform Fluidic Integration
Fluidic valves in workstation fluidic integration
Fluid-path management
Bubble and pressure detection in platform fluidics integration
Tubing and fittings in platform fluidics integration

ON THIS PAGE

Where fluid-path management occurs in the instrumentProduct responsibilities in this operationOrganize the sequence by actual architectureDefine operating conditions for this taskCompare product configurations by the roles on this pageValidate operation results at the receiverLocate abnormalities and restore the next operationReferencesRelated guides

01Where fluid-path management occurs in the instrument

Assign resource states, interlocks and task order to pumps, valves, stations and waste handling. Record liquid destinations and sample identity at interruption, and define retryable steps to prevent duplicate dosing.

Define resource conflicts for pumps, valves, stations and waste handling. Sequential and concurrent actions should follow the same state diagram. If confirmation is lost, preserve sample identity and completed-step records.

02Product responsibilities in this operation

Valves control the current source or destination; the associated drive performs metering or transfer. Port connections, actual positioning and shared-segment renewal must match the operation.

For workstation fluidic integration, confirm task state, sample or vessel identity, concurrent resources, interlocks and restart procedures.

03Organize the sequence by actual architecture

  1. Build a resource-state table covering sources, pumps, valves, stations, wash stations and waste paths. Bind sample or plate-position identity, and list conflicts and interlocks for concurrent tasks.
  2. Start operations in the sequence of preparation, reservation, confirmation and execution. Check communication responses, valve positions, motion positions and actual fluid-path connections separately.
  3. Record receiving results and confirmed delivery. Complete required flushing and restoration before releasing shared resources. An action-complete signal does not establish liquid arrival.
  4. Test interruption recovery before delivery, after partial delivery and after completion. Confirm that stopping, resuming or discarding does not cause delivery to the wrong destination or repeated operations before platform scheduling resumes.

04Define operating conditions for this task

Conditions, results and abnormality records for this operation
To defineDetails
Actual operating conditionsTask state, sample or vessel identity, concurrent resources, interlocks and restart
Acceptance targetTest concurrent operation, limiting states and complete fault recovery; verify that identities, cumulative quantities and records match actual actions
Fault localizationResource conflicts, communication loss or mismatched identities can cause delivery to the wrong destination or repeated dosing.

05Compare product configurations by the roles on this page

Configuration options for the product roles on this page
ProductConfiguration optionConditions to verify
MRV3 multiport rotary valveMultiple-source selectionCompare 10-, 16- and 24-port options and port diagrams; verify high-pressure suitability separately
SV10 solenoid valveOn/off control or branch selectionCheck normal state, differential pressure, flow direction and duty cycle; high-pressure tasks require a separately suitable configuration
  • MRV3 multiport rotary valve
  • SV10 solenoid valve

06Validate operation results at the receiver

Cover concurrency, boundary states and complete recovery after faults. Check that identity, cumulative volume and records match actual operations.

Validate concurrency, restart after interruption and record traceability to prevent sample misassignment or duplicate dosing.

07Locate abnormalities and restore the next operation

Resource conflicts, communication interruptions or identity mismatches can cause misdelivery or duplicate dispensing.

Stop the affected branches and recover using execution records.

Connectable modules are not automatically plug-and-play. Recovery actions must match the current liquid and sample state.

References

View references (2)
  1. [1]FOREACH MRV3 multiport rotary valve: configurations and specifications
  2. [2]FOREACH SV10 solenoid valve: configurations and specifications

Related guides

  • Return to the platform fluidic integration overview
  • Fluidic valves in workstation fluidic integration

Related Products

MRV3 multiport rotary valve; representative configuration. Select capacity, materials and interfaces for the application.

MRV3 multiport rotary valve

SV10 solenoid valve; representative configuration. Select capacity, materials and interfaces for the application.

SV10 solenoid valve

Related Technical Articles

Rotary Valve Selection Guide: From Fluid Paths to System Validation

Map the connections required at each step before comparing specifications. Use the actual liquids, tubing and switching sequence to validate suitability for your instrument.

2026-09-30View Details

How Does a 6-Port HPLC Injection Valve Work? Load, Inject and Vent

Follow sample loading into an external loop and transfer to the column by the mobile phase, distinguishing the HP valve's main positions and vent path from the factors that determine injection volume.

2026-09-29View Details

What Is a Programmable Syringe Pump? Operation, Fluid Routing and Automation

A programmable syringe pump uses a motor to control syringe plunger displacement and speed, executing aspiration, dispensing, pauses and repeated actions through commands. With a routing valve, it can connect reagent reservoirs, reaction vessels and wash paths into an automated dispensing process. Instrument development therefore needs to define volume, fluid connections and timing together.

2026-09-28View Details

Discuss an automation fluidic configuration

Provide a fluidic diagram, actual liquids and pressures in each operating state. Compare 10-, 16- and 24-port options using port diagrams, and verify high-pressure suitability separately. Check normal state, differential pressure, flow direction and energization cycle. Select a separately suitable configuration for high-pressure tasks. Assess configurations against this guide's validation objectives.

Contact an engineer