Foreach TechnologyForeach Technology
Home
Products
Applications
About Us
Contact & Partnership
简体中文EnglishEspañolFrançais한국어Русский
Home
Products
Pump SeriesValve SeriesTubing SeriesFitting SeriesProbe SeriesSmart Control SeriesTubing Assemblies
Applications
All applicationsIVD DiagnosticsLife SciencesLaboratory AutomationAnalytical InstrumentsEnvironmental MonitoringSynthetic Biology
Resources
DatasheetsFluid Resistance CalculatorFitting ReplacementInstallation GuidesMaterial CompatibilityTechnical ArticlesCompany News
About Us
About ForeachR&D and ManufacturingQuality System and QualificationsMilestonesForeach Culture
Contact & Partnership
Contact UsBecome a Distributor
  • Pump Series
  • Valve Series
  • Probe Series
  • Fitting Series
  • Tubing Series
  • Control Series
  • Tubing Assemblies
  • All applications
  • IVD
  • Life Science
  • Lab Automation
  • Analytical Instruments
  • Environmental Monitoring
  • Synthetic Biology
  • Datasheets
  • Fluid Resistance Calculator
  • Fitting Replacement
  • Installation Guides
  • Material Compatibility
  • Technical Articles
  • Company News
  • About Foreach
  • R&D & Manufacturing
  • Quality & Compliance
  • History
  • Foreach Culture
  • Inquiry Form
  • Contact Information

Shenzhen Foreach Technology Co., Ltd.

Address: 13th Floor, 2nd Building, Yufengda Industrial Park, 1008th Guang Qiao Boulevard, Guangming District, Shenzhen 518132 CHINAView Map

Email: [email protected]

Tel: +86 755 8655 3831

LinkedInYouTubeFacebookInstagramX

© 2026 Shenzhen Foreach Technology Co., Ltd. All rights reserved.

Privacy Policy·

Home/Applications/Laboratory automation/Workstation fluidic integration
< Back

Automation Integration: Connecting Robots and Fluidics Through Resource States

Application guide

Fluidic integration involves more than connecting components. Robots, metering pumps, selector valves and waste stations need coordinated task states to deliver liquid to the intended location. After interruption, determine confirmed delivery, the potentially affected vessel and whether the next action may be retried.

Application guides

Workstation fluidic integration application guide

Platform fluidics integration overview
Syringe pumps in workstation fluidic integration
Air-Displacement Pipetting Pumps for Platform Fluidic Integration
Diaphragm Pumps for Platform Fluidic Integration
Fluidic valves in workstation fluidic integration
Fluid-path management
Bubble and pressure detection in platform fluidics integration
Tubing and fittings in platform fluidics integration

ON THIS PAGE

Locate the task in the fluid path firstCommon product roles and application guidesOperating requirements differ by stepFluid-path management: define occupancy and interlocksModule interfaces: verify both communications and fluid connectionsAlarm recovery: distinguish actions that can and cannot be retriedExplore configurations through product application guidesValidate the complete cycle through application resultsCommon selection and recovery questionsReferences

01Locate the task in the fluid path first

Task and sample identity→Resource occupancy→Valve-position and motion confirmation→Liquid-handling action→Records and recovery from interruptions
Illustrative task sequence. Confirm sampling, washing, waste and monitoring branches separately against the instrument drawings.

Arrows indicate task relationships, not that every component is connected in series in one tube. Check valve positions, pump wetted boundaries and operating states for each branch.

Define each liquid action as a traceable state transition: prepare, reserve, execute, confirm and release. Command receipt, valve positioning and actual liquid delivery are different events and need separate roles in interlocks and records.

02Common product roles and application guides

Explore product applications by their role in the instrument
Product categoryRole in this instrument
Syringe pumpDiscrete metering at workstations
Air-displacement pipetting pumpTip-based pipetting at stations
Diaphragm pumpShared platform supply and washing; suitable shared waste aspiration
Fluidic valvesSelection of shared fixed-path resources; branch isolation and state interlocks
Bubble and pressure detectionBranch signals used by platform control
Tubing and fittingsSealed, maintainable connections between modules
  • Syringe pumps in workstation fluidic integration
  • Air-Displacement Pipetting Pumps for Platform Fluidic Integration
  • Diaphragm Pumps for Platform Fluidic Integration
  • Fluidic valves in workstation fluidic integration
  • Bubble and pressure detection in platform fluidics integration
  • Tubing and fittings in platform fluidics integration

03Operating requirements differ by step

Define workstation resources and delivery states before scheduling actions
StageTask categoryOperating conditions to define
Fluid-path management: define occupancy and interlocksShared pumps, valves, wash stations and waste pathsActive sample and receiving container; resources reserved by each action; allowed concurrency; valve and motion confirmations; when resources can be released
Module interfaces: verify both communications and fluid connectionsModule identity and the installed liquid pathController address and module identity; source-to-outlet tubing direction; interfaces, materials and installed pressure; priming sequence and the first working-volume check after reconnection
Alarm recovery: distinguish actions that can and cannot be retriedRecovery at a known dispensing stageInterruption before, during or after delivery; current container and resource occupancy; measured, estimated or unknown delivered volume; conditions for resuming, discarding or repeating

04Fluid-path management: define occupancy and interlocks

Define resource conflicts for pumps, valves, stations and waste handling. Sequential and concurrent actions should follow the same state diagram. If confirmation is lost, preserve sample identity and completed-step records.

  • Fluid-path management

05Module interfaces: verify both communications and fluid connections

Correct module identification still requires verification of tube direction, seals and operating parameters. Post-maintenance release criteria should include priming and working-volume verification.

  • Tubing and fittings in platform fluidics integration

06Alarm recovery: distinguish actions that can and cannot be retried

Resending the same command after partial delivery can duplicate an addition. Define stage-specific stop, resume or discard rules, and keep traceable records.

  • Bubble and pressure detection in platform fluidics integration

07Explore configurations through product application guides

  • Syringe pumps in workstation fluidic integration
  • Air-Displacement Pipetting Pumps for Platform Fluidic Integration
  • Diaphragm Pumps for Platform Fluidic Integration
  • Fluidic valves in workstation fluidic integration
  • Bubble and pressure detection in platform fluidics integration
  • Tubing and fittings in platform fluidics integration

08Validate the complete cycle through application results

For a workstation, coordinate shared pumps, wash stations and waste paths with the active container and step. Test interrupted operations separately before delivery, during partial delivery and after completion; the controller must establish the actual state before retrying.

Validate concurrency, restart after interruption and record traceability to prevent sample misassignment or duplicate dosing.

Test the workstation sequence at the receiving container
Step to validateMeasurements or observationsPriority troubleshooting checks
Fluid-path management: define occupancy and interlocksRun tasks that request the same resources, including interrupted actions; check that reservations, sample identities and actual receiving locations remain consistent.A resource released too early or a stale container position can direct a later operation to the wrong sample even when individual commands succeed.
Module interfaces: verify both communications and fluid connectionsAfter module replacement, verify physical routing and sealing, prime the path and measure the first intended transfer at its receiver.A correct module address does not confirm tube direction, priming or delivery; investigate these before changing a metering program.
Alarm recovery: distinguish actions that can and cannot be retriedInterrupt dispensing before delivery, partway through and after completion. Compare recorded state with the liquid received and verify the permitted resume or discard action.Retain uncertainty when delivery cannot be established. Repeating an unverified command can add a second dose to the same container.

Connectable modules are not automatically plug-and-play. Recovery actions must match the current liquid and sample state.

09Common selection and recovery questions

Does a successful communication command prove liquid delivery?

Also verify flow direction, source, receiver and actual liquid results. Associate module recognition and motion completion with the relevant operating-condition records separately.

Can every alarm use the same retry strategy?

Distinguish interruptions before, during and after delivery, and record the current container and resource state. Define stage-specific conditions for resuming or restarting.

References

View references (3)
  1. [1]FOREACH MRV3 rotary valves: configurations and specifications
  2. [2]FOREACH syringe pumps: configurations and specifications
  3. [3]FOREACH bubble / pressure detection: configurations and specifications

Related Products

MRV3 multiport rotary valve; representative configuration. Select capacity, materials and interfaces for the application.

MRV3 multiport rotary valve

HLD rotary-valve syringe pump; representative configuration. Select capacity, materials and interfaces for the application.

HLD rotary-valve syringe pump

ABD bubble-detection module; representative configuration. Select capacity, materials and interfaces for the application.

ABD bubble-detection module

PDM5 pressure-detection module; representative configuration. Select capacity, materials and interfaces for the application.

PDM5 pressure-detection module

Related Technical Articles

What Is a Programmable Syringe Pump? Operation, Fluid Routing and Automation

A programmable syringe pump uses a motor to control syringe plunger displacement and speed, executing aspiration, dispensing, pauses and repeated actions through commands. With a routing valve, it can connect reagent reservoirs, reaction vessels and wash paths into an automated dispensing process. Instrument development therefore needs to define volume, fluid connections and timing together.

2026-09-28View Details

Rotary Valve Selection Guide: From Fluid Paths to System Validation

Map the connections required at each step before comparing specifications. Use the actual liquids, tubing and switching sequence to validate suitability for your instrument.

2026-09-30View Details

Why Do Air Bubbles Delay or Bias Piston Pump Dispensing?

A completed piston stroke does not prove that the intended liquid volume reached the vessel. Bubble compression temporarily stores displacement; expansion can then cause a trailing dispense or affect the next cycle. Locate where bubbles first appear and compare synchronized pressure and individual dispense masses before and after priming.

2026-09-10View Details

Discuss your automation integration fluidics

Provide a fluid-path diagram, actual liquids and pressures in each state. Specify state confirmation, interlocks, action and refill states, timing windows and restart conditions. Compare configurations against the validation objectives in this guide.

Contact an engineer