What do these products do in this instrument?
Tubing and Fittings: Connecting Process Vessels and Fluid Branches
Form feed, sample and waste paths, choosing wetted materials for the actual formulation and operating duration. After maintenance, check assembly, sealing, priming and volume records before restarting the task.
Tubing and fittings together form sealed connections and the actual transfer path. Check formulation, inner/outer diameters, length, tube-end positioning and port geometry, including added volume in residue and arrival delay.
Design tubing and fittings as a complete wetted path
Tubing, fittings and ports jointly determine sealing, transfer volume and medium-contact coverage. Materials and dimensions must suit formulation, operating conditions and installation. Include tubing length and interface volume in priming, shared residue and arrival delay. After connection changes, recheck delivery and cleaning through the actual path.
Calculate connection volume and post-maintenance recovery
Shared volume affects liquid arrival and flushing; interface gaps may retain the previous composition. Record length, actual bore and tube insertion position. After disassembly, reprime and check seals, then compare first-cycle delivery, blanks or recovered product to confirm path recovery.
Translate actual branch conditions into configuration requirements
| Condition | To confirm |
|---|---|
| Materials and assembly | Provide formulation, tubing inner/outer diameters, length, fitting structure and port fit. |
| Volume and load | Calculate shared and replacement-component added volumes; measure actual flow and response. |
| Maintenance recovery | Record disassembly locations and added volume; recheck priming, sealing and first-cycle received results. |
Compare product configurations by the roles on this page
| Product | Configuration option | Conditions to verify |
|---|---|---|
| Tubing materials and dimensions | Connection paths and shared volume | Bore, length, load and actual formulation jointly determine materials and dimensions |
| Rigid-tubing fittings | Tube-end positioning and sealed connections | Check tube outer diameter, threads, seal structure and port-bottom geometry |
Confirm product roles in actual operation
Connect the culture process, actual feeding and sample analysis, retaining records across the entire run.
Does a fitting that tightens prove the tubing assembly is suitable?
Also confirm port geometry, tube-end positioning and seal fit. Check leakage, hold-up and performance after repeated maintenance under actual conditions; thread engagement alone is insufficient.
Periodic dispensing, continuous feeding and aseptic sampling have different requirements. A single metering test cannot establish all three.