What do these products do in this instrument?
Bubble and pressure detection: branch-anomaly signals for recovery control
Provide pressure or bubble signals at specified locations alongside records of power loss, empty sources and blockages. The controller reconciles actual vessel state, cumulative material and unfinished actions before deciding whether to resume or stop.
ABD provides bubble or liquid-state signals for defined tubing; PDM5 provides pressure information at a defined location. Configure module, position and action window separately; the controller associates affected samples or tasks.
Match sensing locations to specific fluidic problems
Bubble modules report bubble or liquid state in defined tube segments; pressure modules report pressure at defined positions. Before selecting mounting points, define the phase and abnormality to observe: aspiration, delivery, source depletion or branch-load changes. Associate sensor positions with affected samples, cuvettes or stations.
Connect signals, action windows and recovery conditions
The same signal may mean different things at different valve positions or operating phases. Record normal ranges and faults with actual liquids, tubing and sequences. The controller combines action timing, confirmed delivery status, volume records and sample identity to pause, review or recover; one pressure change cannot directly identify a blockage location or specific cause. Distinguish measured, estimated and unknown volumes; completion of a command does not prove actual liquid delivery.
Translate actual branch conditions into configuration requirements
| Condition | To confirm |
|---|---|
| Installation conditions | Specify tubing dimensions, liquid, sensing location and branch to observe. |
| Timing and baseline | Record valve positions, pump actions, normal changes and fault-detection windows. |
| Abnormality handling | Associate affected containers with confirmed delivery status and volume records; define conditions for review, continuation or re-execution. Distinguish measured, estimated and unknown volumes; completion of a command does not prove actual liquid delivery. |
| Operation | Specific operating conditions |
|---|---|
| Recovery control | Cumulative quantities, sample identity, completed stages, unfinished actions and restart restrictions |
Recovery control
Define stage-specific stopping and restart after power loss, empty sources, blockage, leakage, full waste containers or communication faults. Preserve cumulative material, sample identity and unfinished actions to prevent duplicate additions after restart.
Preserve cumulative material, sample identity and unfinished-action records. After power returns, establish the current stage and delivered volume before deciding whether to resume or stop.
Cover power loss, empty feed sources and blockage. Reconcile the material ledger with actual vessel conditions before resuming.
Lost feeding state or repeated execution can change cumulative material and process volume. The controller determines task validity; sensors alone do not establish dose or method results.
Compare product configurations by the roles on this page
| Product | Configuration option | Conditions to verify |
|---|---|---|
| ABD bubble-detection module | Bubble or liquid-state identification in defined tubing | Validate detection and false alarms for tubing material, dimensions, medium and action window |
| PDM5 pressure-detection module | Pressure-state monitoring at a defined fluidic location | Confirm range and wetted configuration by model; validate normal baseline and abnormalities separately |
Confirm product roles in actual operation
| Operation | Measurements and observations | Priority checks |
|---|---|---|
| Recovery control | Cover power loss, empty feed sources and blockage. Reconcile the material ledger with actual vessel conditions before resuming. | Lost feed-state records or repeated execution can alter cumulative material and process volume. |
Include extended operation, power loss, depleted feed, blockage and post-maintenance restart. Check cumulative delivery and contamination boundaries.
Can dispensing be repeated immediately after bubbles or abnormal pressure are detected?
First establish whether partial delivery has occurred and which container is affected. Immediate repetition may double-dose it. Act on the actual state and recheck the first cycle after recovery.
Evaluate fluidic feedback and biological process results separately. A component combination alone does not establish sterility or continuous-culture capability.