Foreach TechnologyForeach Technology
Home
Products
Applications
About Us
Contact & Partnership
简体中文EnglishEspañolFrançais한국어Русский
Home
Products
Pump SeriesValve SeriesTubing SeriesFitting SeriesProbe SeriesSmart Control SeriesTubing Assemblies
Applications
All applicationsIVD DiagnosticsLife SciencesLaboratory AutomationAnalytical InstrumentsEnvironmental MonitoringSynthetic Biology
Resources
DatasheetsFluid Resistance CalculatorFitting ReplacementInstallation GuidesMaterial CompatibilityTechnical ArticlesCompany News
About Us
About ForeachR&D and ManufacturingQuality System and QualificationsMilestonesForeach Culture
Contact & Partnership
Contact UsBecome a Distributor
  • Pump Series
  • Valve Series
  • Probe Series
  • Fitting Series
  • Tubing Series
  • Control Series
  • Tubing Assemblies
  • All applications
  • IVD
  • Life Science
  • Lab Automation
  • Analytical Instruments
  • Environmental Monitoring
  • Synthetic Biology
  • Datasheets
  • Fluid Resistance Calculator
  • Fitting Replacement
  • Installation Guides
  • Material Compatibility
  • Technical Articles
  • Company News
  • About Foreach
  • R&D & Manufacturing
  • Quality & Compliance
  • History
  • Foreach Culture
  • Inquiry Form
  • Contact Information

Shenzhen Foreach Technology Co., Ltd.

Address: 13th Floor, 2nd Building, Yufengda Industrial Park, 1008th Guang Qiao Boulevard, Guangming District, Shenzhen 518132 CHINAView Map

Email: [email protected]

Tel: +86 755 8655 3831

LinkedInYouTubeFacebookInstagramX

© 2026 Shenzhen Foreach Technology Co., Ltd. All rights reserved.

Privacy Policy·

Home/Applications/In Vitro Diagnostics/Coagulation analyzer
< Back

Bubble and pressure sensing in coagulation analyzers

Application guide

A fluidic event in a coagulation analyzer matters partly because of when it occurs relative to sample and reagent contact. Locate monitoring around the addition sequence, and preserve the reaction-cuvette and method timing records needed to decide what happens after an interruption.

Applicable architecture

Coagulation instruments may run clotting, chromogenic or immunoturbidimetric methods. This page discusses coordination of liquid delivery and reaction timing. Define initiation, preincubation and reading rules by method rather than reducing every assay to the same clotting endpoint.[3]

Application guide

Coagulation analyzer

Coagulation analyzer
Diaphragm pumps in coagulation analyzers
Cleaning reused paths and recovering the first dose
Bubble and pressure sensing in coagulation analyzers
Tubing and fittings in coagulation analyzers
Multiport rotary valves in coagulation analyzers
Switching reagent sources and reaction paths
Piston pumps in coagulation analyzers
Assay-specified sample delivery
Sampling probes in coagulation analyzers
Syringe pumps in coagulation analyzers
Reagent arrival and reaction timing

On this page

What do these products do in this instrument?Relate sensing position to the reaction-start sequencePreserve timing when an addition is interruptedTranslate actual branch conditions into configuration requirementsState monitoringCompare product configurations by the roles on this pageRelated operations and architecture comparisonsConfirm product roles in actual operationCan an interrupted addition resume when the bubble alarm clears?ReferencesRelated guides

01What do these products do in this instrument?

Bubble and pressure sensing: monitor reaction dispensing

Use the defined bubble or pressure location to observe the dispensing branch, while the controller associates the event with the active cuvette and addition phase. A signal upstream of the probe has to be interpreted with the intervening path and actual liquid-arrival sequence.

ABD provides bubble or liquid-state signals for defined tubing; PDM5 provides pressure information at a defined location. Configure module, position and action window separately; the controller associates affected samples or tasks.

02Relate sensing position to the reaction-start sequence

Identify whether the monitored segment contains sample, reagent or system liquid and where it lies relative to the probe outlet. Record motor completion, liquid leaving the outlet and arrival at the reaction position as separate events when validating the sequence. Choose the observation window around the event relevant to the assay rather than around a generic motion command.

Further technical reading

  • Why Do Air Bubbles Delay or Bias Piston Pump Dispensing?
  • What is flow resistance calculation for? Using the Foreach calculator in fluid-path design and selection

03Preserve timing when an addition is interrupted

An event before liquid contact and an event during or after contact leave different reaction states. Retain the cuvette, addition order, recorded times and evidence of received volume before attempting recovery. Clotting, chromogenic and immunoturbidimetric methods define different initiation or reading rules; the method decides whether a reaction can continue after the path is restored.

04Translate actual branch conditions into configuration requirements

Bubble- and pressure-sensing configuration conditions in coagulation analyzers
ConditionTo confirm
Observed liquid and locationMap the sample, reagent or system-liquid segment, probe outlet and sensing point so the distance between an observed event and the reaction is explicit.
Method timingDefine the addition phase, contact event, incubation or acquisition window and controller record used for the selected assay.
Interrupted reactionKeep the affected cuvette and known or unknown delivery status with the timestamps; define the method response before allowing another addition.
Operations supported in this instrument
OperationSpecific operating conditions
State monitoringAssay-specific addition and reading sequence, sensing position, liquid-arrival observations, current cuvette and treatment of uncertain partial delivery

05State monitoring

Observe events with the actual sample and reagent sequence, including idle recovery and the first addition after washing. A signal observed during priming has a different consequence from the same signal during an assay addition.

Keep the cuvette association valid until the affected liquid could have reached its destination. Review the recorded path and timing if a delayed alarm arrives after the controller has advanced to another step.

Measure event detection and end-to-end controller response under the relevant addition phases. Compare these with actual receipt and contact observations rather than using the sensor timestamp as the reaction-start timestamp.

After restoring the path, check the next valid addition and the method response to residual wash liquid. The interrupted cuvette remains subject to its own method-defined disposition.

06Compare product configurations by the roles on this page

Configuration options for the product roles on this page
ProductConfiguration optionConditions to verify
ABD bubble-detection moduleBubble or liquid-state identification in defined tubingValidate detection and false alarms for tubing material, dimensions, medium and action window
PDM5 pressure-detection modulePressure-state monitoring at a defined fluidic locationConfirm range and wetted configuration by model; validate normal baseline and abnormalities separately
  • ABD bubble-detection module

    ABD bubble-detection module

    View Details
  • PDM5 pressure-detection module

    PDM5 pressure-detection module

    View Details

07Related operations and architecture comparisons

Assay-specified sample delivery

Small sample doses require checks of tip droplets, cuvette-wall contact and the system-liquid interface. Measure at the actual reaction location to relate volume to results.

  • Assay-specified sample delivery

08Confirm product roles in actual operation

Operating-point validation and fault localization
OperationMeasurements and observationsPriority checks
State monitoringChallenge the dispensing branch before, during and after the relevant addition phase. Compare sensor events and controller response with observed liquid arrival, actual receipt and retained reaction timing.An alarm cleared after priming does not restore an earlier reaction-start time. Review the interrupted reaction separately from verification of the next valid dispensing cycle.

Acceptance requires a useful association between the observed fluidic event and the method-defined reaction state. Verify the next addition after recovery without treating motion completion as a measurement of liquid delivery.

09Can an interrupted addition resume when the bubble alarm clears?

Only the assay procedure can determine whether the recorded reaction state permits continuation. Establish whether contact or partial addition occurred, retain the original timing, and handle that cuvette separately from restoring the dispensing path.

Pump or valve response time is not the reagent-contact or instrument measurement-start time.

References

View references (3)
  1. [1]FOREACH ABD bubble-detection module: configurations and specifications
  2. [2]FOREACH PDM5 pressure-detection module: configurations and specifications
  3. [3]Sysmex CA-600: clotting, chromogenic and immunoturbidimetric configurations

Related guides

  • Back to the coagulation analyzer fluidics overview

Related Products

ABD Air-bubble detectors

ABD Air-bubble detectors

PDM5 Pressure sensors

PDM5 Pressure sensors

Related Technical Articles

Why Do Air Bubbles Delay or Bias Piston Pump Dispensing?

A completed piston stroke does not prove that the intended liquid volume reached the vessel. Bubble compression temporarily stores displacement; expansion can then cause a trailing dispense or affect the next cycle. Locate where bubbles first appear and compare synchronized pressure and individual dispense masses before and after priming.

2026-09-10View Details

What is flow resistance calculation for? Using the Foreach calculator in fluid-path design and selection

The free flow rate of the pump meets the requirements. After installing the pipelines, valves and joints, the liquid supply at the end is insufficient. Flow resistance calculations can break the problem down into comparable data: what pressure differential is required at the target flow rate, where does the pressure loss mainly occur, and what happens if the pipe diameter, pipe length, component Cv or medium viscosity is changed. This article combines the actual function of the Foreach flow resistance calculator with a recalculable fluid circuit case to explain how to use the calculation results for design, selection, troubleshooting and prototype verification.

2026-09-11View Details

Discuss Your IVD Fluidic Requirements

Share the instrument type, sample and reagent properties, working volumes, cycle timing, fluid path and acceptance criteria so we can discuss suitable components and prototype evaluation.

Discuss your application