Foreach TechnologyForeach Technology
Home
Products
Applications
About Us
Contact & Partnership
简体中文EnglishEspañolFrançais한국어Русский
Home
Products
Pump SeriesValve SeriesTubing SeriesFitting SeriesProbe SeriesSmart Control SeriesTubing Assemblies
Applications
All applicationsIVD DiagnosticsLife SciencesLaboratory AutomationAnalytical InstrumentsEnvironmental MonitoringSynthetic Biology
Resources
DatasheetsFluid Resistance CalculatorFitting ReplacementInstallation GuidesMaterial CompatibilityTechnical ArticlesCompany News
About Us
About ForeachR&D and ManufacturingQuality System and QualificationsMilestonesForeach Culture
Contact & Partnership
Contact UsBecome a Distributor
  • Pump Series
  • Valve Series
  • Probe Series
  • Fitting Series
  • Tubing Series
  • Control Series
  • Tubing Assemblies
  • All applications
  • IVD
  • Life Science
  • Lab Automation
  • Analytical Instruments
  • Environmental Monitoring
  • Synthetic Biology
  • Datasheets
  • Fluid Resistance Calculator
  • Fitting Replacement
  • Installation Guides
  • Material Compatibility
  • Technical Articles
  • Company News
  • About Foreach
  • R&D & Manufacturing
  • Quality & Compliance
  • History
  • Foreach Culture
  • Inquiry Form
  • Contact Information

Shenzhen Foreach Technology Co., Ltd.

Address: 13th Floor, 2nd Building, Yufengda Industrial Park, 1008th Guang Qiao Boulevard, Guangming District, Shenzhen 518132 CHINAView Map

Email: [email protected]

Tel: +86 755 8655 3831

LinkedInYouTubeFacebookInstagramX

© 2026 Shenzhen Foreach Technology Co., Ltd. All rights reserved.

Privacy Policy·

Home/Applications/In Vitro Diagnostics/Coagulation analyzer
< Back

Tubing and fittings in coagulation analyzers

Application guide

In a coagulation analyzer, the connection between the metering unit and reaction position contributes to liquid arrival as well as sealing. Evaluate a tube or fitting change against the assay addition sequence, particularly the first delivery after washing or service.

Applicable architecture

Coagulation instruments may run clotting, chromogenic or immunoturbidimetric methods. This page discusses coordination of liquid delivery and reaction timing. Define initiation, preincubation and reading rules by method rather than reducing every assay to the same clotting endpoint.[3]

Application guide

Coagulation analyzer

Coagulation analyzer
Diaphragm pumps in coagulation analyzers
Cleaning reused paths and recovering the first dose
Bubble and pressure sensing in coagulation analyzers
Tubing and fittings in coagulation analyzers
Multiport rotary valves in coagulation analyzers
Switching reagent sources and reaction paths
Piston pumps in coagulation analyzers
Assay-specified sample delivery
Sampling probes in coagulation analyzers
Syringe pumps in coagulation analyzers
Reagent arrival and reaction timing

On this page

What do these products do in this instrument?Budget the path from metering unit to reaction contactCheck the first reaction after washing or replacementTranslate actual branch conditions into configuration requirementsCompare product configurations by the roles on this pageRelated operations and architecture comparisonsConfirm product roles in actual operationCan the original timing program be retained after changing tube length?ReferencesRelated guides

01What do these products do in this instrument?

Tubing and fittings: maintain dispensing paths and delays

Connect sample or reagent sources to the metering and probe interfaces without losing the relationship between the programmed addition and arrival at the cuvette. Include any system-liquid segment and reused wash path when reviewing a change.

Tubing and fittings together form sealed connections and the actual transfer path. Check formulation, inner/outer diameters, length, tube-end positioning and port geometry, including added volume in residue and arrival delay.

02Budget the path from metering unit to reaction contact

Identify the installed length, bore and interface volumes between the active source and the probe. A different connection can change liquid retained and renewed before the next addition. Keep the actual arrival event separate from motor or valve completion, and assess the effect of the proposed assembly with the method-defined addition and reading sequence.

Further technical reading

  • Microfluidic Hard-Tube Fitting Selection Guide: Flanged, Ferrule and Snap-Ring Connections
  • Why Does Actual Flow Change So Much When the Tubing Size Changes on the Same Miniature Diaphragm Pump?
  • What is flow resistance calculation for? Using the Foreach calculator in fluid-path design and selection

03Check the first reaction after washing or replacement

The maintained path may be mechanically sound while retaining wash liquid or a different liquid column. Reprime to the intended destination and measure the next received dose and arrival time. Then evaluate the assay response to that first addition; clotting, chromogenic and immunoturbidimetric methods do not share one universal restart timing rule.

04Translate actual branch conditions into configuration requirements

Tubing and fitting configuration conditions in coagulation analyzers
ConditionTo confirm
Assembly and contactSpecify sample, reagent or system-liquid contact, installed tube dimensions, mating-port geometry and seal arrangement.
Arrival relative to methodDefine the probe/cuvette position, addition sequence and actual contact observation used to relate a connection change to assay timing.
Wash and service recoveryInclude priming destination, residual wash liquid and first-dose observations in the release procedure after opening the path.
Operations supported in this instrument
OperationSpecific operating conditions
Assay-specified sample deliveryActual sample-contact or system-liquid path, installed tube and fitting volume, probe position and method-specific liquid-arrival sequence
Cleaning reused paths and recovering the first doseReused sections reached by washing, drain/prime destinations and the first dose through the cleaned path before a method-valid reaction

05Compare product configurations by the roles on this page

Configuration options for the product roles on this page
ProductConfiguration optionConditions to verify
Tubing materials and dimensionsConnection paths and shared volumeBore, length, load and actual formulation jointly determine materials and dimensions
Rigid-tubing fittingsTube-end positioning and sealed connectionsCheck tube outer diameter, threads, seal structure and port-bottom geometry
  • Tubing materials and dimensions

    Tubing materials and dimensions

    View Details
  • Rigid-tubing fittings

    Rigid-tubing fittings

    View Details

06Related operations and architecture comparisons

Assay-specified sample delivery

Small sample doses require checks of tip droplets, cuvette-wall contact and the system-liquid interface. Measure at the actual reaction location to relate volume to results.

  • Assay-specified sample delivery

Cleaning reused paths and recovering the first dose

Residual wash fluid may alter the next formulation or carry contamination. Check internal flushing, external coverage and the first dose through the cleaned path, evaluating residue effects with the assay.

  • Cleaning reused paths and recovering the first dose

07Confirm product roles in actual operation

Operating-point validation and fault localization
OperationMeasurements and observationsPriority checks
Assay-specified sample deliveryCompare received sample volume and observed arrival at the cuvette before and after the assembly change, using the assay addition sequence.Extra held volume, trapped gas or a seating gap may change the transfer even when the valve and motor report the same timings.
Cleaning reused paths and recovering the first doseAssess the first addition after washing or maintenance for volume, arrival and the assay effect of residual wash liquid.Mechanical sealing alone cannot confirm restoration of the intended liquid composition or reaction timing.

Accept the connection change with evidence at the reaction position: sealed assembly, delivered volume, arrival and the appropriate first-reaction result. Keep the method timing record distinct from component response time.

08Can the original timing program be retained after changing tube length?

Retain it only if the assembled path still meets the required delivery and arrival sequence. Recheck the actual reaction position, including the first dose after washing; matching fittings or an unchanged pump command do not establish that result.

Pump or valve response time is not the reagent-contact or instrument measurement-start time.

References

View references (3)
  1. [1]FOREACH tubing materials and dimensions: configurations and specifications
  2. [2]FOREACH rigid-tubing fittings: configurations and specifications
  3. [3]Sysmex CA-600: clotting, chromogenic and immunoturbidimetric configurations

Related guides

  • Back to the coagulation analyzer fluidics overview

Related Products

Tubing

Tubing

Hard-tube fittings

Hard-tube fittings

Related Technical Articles

Microfluidic Hard-Tube Fitting Selection Guide: Flanged, Ferrule and Snap-Ring Connections

Selection essentials: Check port geometry, tubing OD and fluid first, then pressure, maintenance frequency and tube-end preparation. Flanged fittings press a tube-end flange against a flat sealing face; ferrules grip the tube as the fitting tightens; snap-ring designs use a sleeve and sealing ring. Matching threads and tube diameters alone do not establish compatibility.

2026-10-12View Details

Why Does Actual Flow Change So Much When the Tubing Size Changes on the Same Miniature Diaphragm Pump?

Even when the pump is unchanged, installed flow can change because of tubing inner diameter, length, bends, and the minimum bore of fittings. When flow falls after a tubing change, the effective response is neither to blame the pump first nor to enlarge every tube indiscriminately. Measure inlet pressure, outlet pressure, and accumulated flow together to determine where the added restriction actually occurs.

2026-08-24View Details

What is flow resistance calculation for? Using the Foreach calculator in fluid-path design and selection

The free flow rate of the pump meets the requirements. After installing the pipelines, valves and joints, the liquid supply at the end is insufficient. Flow resistance calculations can break the problem down into comparable data: what pressure differential is required at the target flow rate, where does the pressure loss mainly occur, and what happens if the pipe diameter, pipe length, component Cv or medium viscosity is changed. This article combines the actual function of the Foreach flow resistance calculator with a recalculable fluid circuit case to explain how to use the calculation results for design, selection, troubleshooting and prototype verification.

2026-09-11View Details

Discuss Your IVD Fluidic Requirements

Share the instrument type, sample and reagent properties, working volumes, cycle timing, fluid path and acceptance criteria so we can discuss suitable components and prototype evaluation.

Discuss your application