Locate the source, drive and receiving position for this task
Define all ports, valve states, pressures in each state, shared volume and displacement volume. Follow the diagram to confirm liquid contact, pressure and destination before assigning drive and connection roles.
Define switching windows from delay volume
Estimate arrival from the target liquid segment, flow and path volume, then establish switching windows using actual signals. Destination resistances differ; confirm actual pressure and permitted disturbance for each.
| Condition to compare | Information required | Selection affected |
|---|---|---|
| Switching time | Target liquid segment and arrival delay | Define valve actions and measurement windows |
| Loads on both paths | Different resistances in detector and waste paths | Check switching pressure transients |
| Shared volume | Hold-up volume around the valve and tubing length | Check delay and baseline recovery |
Compare product options against task requirements
The following candidate options match this page's responsibilities. Compare them against the operating conditions described, then check capacity, materials and interfaces on the product pages. Card images show representative configurations; suitability must still be confirmed at actual operating points and by application results.
| Product category | Corresponding role | Confirm before selection |
|---|---|---|
| SV10 solenoid valve | On/off control or branch selection | Check normal state, differential pressure, flow direction and duty cycle; high-pressure tasks require a separately suitable configuration |
| HP high-pressure injection valve | Pressurized injection-path switching | Check port pressures and sample loops in loading, injection and other states |
Associate detection state with liquid-segment destination
Associate detection state with valve position and identify the target segment before switching. Define the default destination during maintenance or faults to prevent unsuitable liquid entering the detector.
Action records should link commands, valve or interface states and actual received results. When raw material, container or sample identity changes, reconfirm shared paths and conditions permitting the next step. Completion of drive movement alone does not replace task acceptance.
Check pressure transients and baseline recovery
Measure actual arrival, switching loss, pressure transients and baseline recovery. Timing estimates support design; acceptance depends on retaining the correct detection segment and routing waste correctly.
| Validation scenario | Measurement or observation | Interpretation and action |
|---|---|---|
| Segment arrival time | Associate valve commands with actual liquid segments | If the window shifts, check flow and path volume |
| Switching disturbance | Compare pressure and detection baseline | Confirm recovery before accepting valid detection signals |
Record test medium, configuration, installed path and operating sequence; present routine operating points and boundary results separately. Calculations support design discussions, component documentation checks models, and installed measurements confirm the actual task.
After an abnormality or maintenance, first identify which segment needs recovery
Mispositioning, shared-path residue or abnormal switching pressure can affect the next task. Stop pumping and check ports, then flush again after restoring the correct state.
Retain current source, container identity, completed actions, valve or interface state and actual receiving information. Use the table to locate the stage that changed before deciding to retry, continue or restart. After recovery, recheck the relevant operating point before returning an uncertain action to the automatic cycle.
Continue with tasks on the same branch
- Analytical fluidic valves: source selection, injection, diversion and isolation
- MRV3 Multiple-Source Selection: Port Maps, Displacement and Challenging Liquid Combinations
- High-Pressure Sample-Loop Injection: Loading and Injection States
- Solenoid Shutoff: Normal State, Energization Cycle and Fault Routing